2/10/13

The Wire (s)

The wire saga has finally come to an end. You first read about it here. Then again here.

A brief recap: The wires that were hanging off of the side of our house had to be hooked up to one of the electric poles on either side of our house. Sounds simple enough but, this couldn't happen until our neighbors signed the waiver that said wires could cross the plane of their property.

Until the wires were taken care of the appraisal was pushed back and so was our ability to convert from a construction loan and into a permanent loan.

We needed the owners of two houses next to us to sign off on the waiver. The electrician failed to obtain the signatures during the (actual) construction phase so Mr. C asked that we get involved and be "neighborly". Unfortunately, the task wasn't as simple as knocking on the door and asking for a cup of sugar. Both houses are rented out so tracking down the owners was our first hurdle. (Thank goodness for the internet and a girlfriend who knows her way around it.) Getting the owners to return a phone call or respond to a letter was a whole other saga and physically obtaining the signatures was the worst. One out of three of the property owners was particularly awful to deal with. But, after I established contact and after Mr. C bribed each and every one of them (seriously! this is what our world has come to?!) we finally were free and clear to have the electrical company, BGE, come out and do the install. 

Here is an old picture of  what the wires looked like for the past 6 months. 


Now, the view looks a little more like this. 


Wait. Where'd the wires go? Confused? Yeah, well, apparently the wires were installed on the "wrong" (South) side of the house because the signatures that we received were from the neighbors on the North side. 

So BGE came, scoped the scene, said "nope", and left. The electrician had to come back to move the wires from one side of the house to the other. 

Another request that BGE made was to make provisions so they could get their 25ft ladder out the back of our house. With the tiny back patio and a fence something creative had to be done. So Mr. C cut out a gate in the (once solid) privacy fence.


The gate opens up into the neighbor's back patio. No need to ever open that thing again so we have since put locks on it. It's not exactly what we wanted but, hey, it got the job done. 


Not only did the wires near the roof have to be moved but so did the electrical box.


After this mess...


... was all cleaned up.

And moved over.


BGE was asked back out to the house and the wires (finally) were installed.


Three cheers now, HIP HIP HURRAY!

It is hard to believe that this seemingly simple task could've been so drawn out and frustrating. 


If I were to share any advise to fellow renovating, home owners, I would say to get going on projects that involve neighbors, city permits, electrical companies in the beginning of the renovation process, (& by get going, I mean full court press). You never know what kind of snags you may end up with along the way.

Never thought we'd be so happy to see some wires in the air.  

 
 After all, where else are the birds supposed to sit in Charm City?

10/23/12

Tying Up The Loose Ends

It's been a while since I've talked about the house so, you probably think that chapter of this book is closed. But, there are still some loose ends around here that need to be tied up before the house is 100% completed.

We're still having the issue with the power as you read about here. 

We currently have one out of two signatures needed in order for our neighbors to grant us an easement to run the power lines over their property. The problem being that none of the residents in the homes on our side of the street are the owners. So, getting ahold of the property owner is proving quite complicated. Getting them to sign this d*mn piece of paper is even harder. 

What is a priority to us is not to these people. 


Those wires hanging off of the side of our house...
... need to be hooked up to this utility pole.


Once that final signature has been obtained then the local power company, BGE, can come hook up our "for real" power. Currently, we are using some "not for real" power -huh? Yeah, I'm not sure either. All I know is that Mr. C suggested for us not to run every appliance at once while every light is on for an extended period of time.

Some of the other things that needed to be completed include:

  • Install our address on the transom above the front door. (so, none of you get lost trying to find our house when you come visit) 


  • Install the remaining light fixtures; the bathrooms have temporary lights. This is because our permanent fixtures weren't on site yet and we needed to pass an inspection to live here.

  • Ensure Charm City converts our property from 2 to 1. (so we only pay taxes on ONE!)
  • Appraisal
  • Convert to our permanent loan
Things once happened so quickly around here, now they seem to be moving much slowwwer. We're hoping to be finished with this whole shebang by the end of the month. But, I am losing that faith as this month seems to be flying by. Maybe November will bring us a little luck. 

Regardless, my fingers are crossed that it's soon!


Despite this frustrating last leg of the project, we still love this sweet lil brick row house of ours.


7/30/12

The Skinny

Before I get to the juicy news I wanted to share with you some of Week 17's progress.

The updated TBC list:

TBC
✓  Paint
✓  Flooring
✓  Cabinets
✓  Posts and rails for internal staircase
✓  Plumbing fixtures
✓  Appliances
✓  Countertops 
✓  Fence
     Stairs to RTD
     Garage door 
     Permit

Plumbing fixtures are in. Here is our kitchen sink, well the faucet at least. 
The crew is protecting the countertops beneath as to why I don't have a "money" kitchen shot.


Countertops you say? I am so spoiled lucky! The countertops I have dreamed of are now my own little reality! They are Carrara marble and the island is butchers block. 

The fence in the back of the house was completed. Hadyn's mother suggested we put up rod iron to ensure our safety or possibly glue down broken glass. Depending how some of these neighbors behave we may entertain those options.

Lighting fixtures are up (not all of them)

Here is our little powder room.

The posts and rails were built for the internal staircase. 
The stairs were being stained over the weekend to match the dark wood floors. 

The laundry closet complete with full size, spiffy washer/dryer we pretty much stole got for cost from the appliance store, HHGreg. Washer/dryer : me :: SuperFridge : H
Now where on earth do I keep the laundry supplies?! (soap, fabric softener, etc)


The second bath.


This weekend H's family visited to celebrate our sweet, nephew Charlie's baptism and middle brother/uncle/Godfather/DDS extraordinaire's birthday.


Said BIL (brother in law), James was busy scaling the walls to the RTD while I snapped this FFF (forced family fun) photo of H and his 'Papa Bear' in our master closet. I was trying to show just how large the closet is.

All in all the house is looking pretty ready to move into. 
But, alas, it is not. 

Here's the skinny on why:

The house is VERY close to done. As in, Mr. C says he will be 99% complete (excluding the final punch-list) on Tuesday (tomorrow!). 

However, the house has to be inspected and we have to receive an Occupancy Permit from the City before we can legally move in. The permit will likely NOT be granted if we cannot get the power on. As in this is still tied into the power-line dilemma I told you about here. 


It is my understanding that the permits have to be signed and processed through the local power company, BGE.
Once approved, the power has to be hooked up and turned on by BGE. 
Then the inspection for our Occupancy Permit will happen. 
THEN we can move in. 

All in all, the BEST case scenario we will move in by August 1. WORST case scenario we will move in by August 16. 

We have to move out of our rental house by the morning of August 1. (I didn't plan that - it just worked out that the owner of our rental is moving back in and needs it by that date.)

Please say a little prayer, meditate on it, send positive energy, or just think happy thoughts for us! 

7/11/12

While We Were Gone

Terribly sorry for the delay in recent posts folks. We were busy driving from Maryland to Wyoming (and back). No, that is not a type-o, I did mean to say "DRIVE". We returned late Sunday night and swung by the house Monday. This is my recap of what went on while we were away.


(But, if you need a refresher of what things looked like before we left look here.)


The windows were put in.


As well as our front door.


This is a view of those from the outside.



The concrete was poured for the garage and for the patio out back.


The HardiPlank was installed in the rear of the house. HardiPlank is a fiber cement siding.
(gutters were also in place)

The fence posts for the rear patio were set.
 


The house was insulated.

Sheetrock (drywall) was installed.
(kitchen)

(small bedroom)

Some internal doors were installed.
 (they will be painted and the gold hardware will be removed-thank goodness)

The tile man was at the house showing off his goods and I'm not just talking about his stellar 'plumbers' ('tilers'?) crack.
 
(second bath)

If all of that wasn't amazing enough, here is a picture of a transom window that has been framed out. There will be one for each of the three of the bedrooms. Allowing more (all together now) LIGHT into the rooms. You surely remember how I do looooove light! If not, refer to this old post.

We also went on the roof for the first time. This is a picture of our roof ridge. The upper portion of the picture shows the front side's asphalt shingles. The lower portion shows the backside's (hehe) rubber roof. The roofing material is different because of the difference in roof pitch (and for another reason I will get to eventually).


I wonder what else we found while we were up there...